Plan the pour. Count the panels. Keep the record.

InfraThread is the program and handoff system for precast concrete. Buildings and floors on one schedule, panel counts on every level, and a history of who held each job that nobody can quietly rewrite.

  • Working-day schedules
  • Panel counts per floor
  • Handoffs on the record
Pour programsPanel registersOrdering and deliveryRole handoffs
Built for the yard and the site

The program and the panels, in one place.

A precast job is two questions asked over and over: when does this floor run, and how many pieces does it need? InfraThread answers both from the same record.

A program that moves as one

Every floor carries its own pour window and cycle. Shift one and the floors above re-chain behind it, counted in working days against the project calendar — so three weeks of shutdown is three weeks of work lost, not twenty-one days on a calendar.

Counts you can trust

Each item carries a count on every floor it sits on, and the grid never guesses. Counted, none on this floor, and not counted yet are three different answers — and the elevation shows which one you are looking at.

Ordering that can be undone

Release an item to the factory and record it arriving. Reverse an order and the timeline says who placed it, when, and why it was pulled back — because the correction matters as much as the original.

Permissions the server enforces

Roles decide who may schedule, order, or close work. Every switch is enforced by the API, not merely hidden from the screen — so what a role cannot do, it genuinely cannot do.

How it works

Three steps, and the record writes itself.

  1. 1

    Lay out the program

    Add the buildings, then a run of floors with one pour cycle. Weekend rules are set per building, so a yard that works Saturdays schedules differently to one that does not.

  2. 2

    Place the items

    Put each element on the floors it belongs to and give it a count. Every placement runs for that floor’s own window, so moving the floor moves the work with it.

  3. 3

    Hand the work on

    Send a job to the next role in the chain with the drawings attached. The timeline keeps who sent it, who holds it now, and what was said — permanently.

Program summary

The whole site, one week at a time.

Read the program by item, by building, or by project. Weekly showflow for the next run of work, monthly for the shape of the year, and tender jobs kept visibly apart from committed ones.

  • Delivery status against the floor that needs it
  • Panels totalled per period, never per guess
Start with your company

Put your next program on the record.

Create a workspace, add your first building, and place the panels that go on it. Nothing to install.